Hi,
I need three split systems to be gased.
Units are phisically installed both compressor and indoor. Wiring is done. Plumbing for condensed water is done. I need your assistance to flare copper, vacum it and release gas. All three systems are back-to-back. Run is 4m approximately. The wall is drilled for you to run copper.
Thank you.
Specific Job Details:
Schedule: Need job done this week
Budget: Not Specified
Site Visit: Anytime