We are installing a Panasonic CS-Z80TKR split system, we have the outdoor unit in place on a concrete pad (see photo for location) and the bracket mounted to the wall ready to put up the indoor unit, plaster below the indoor unit has not been hung yet (see attached photos).
We require installation of piping from indoor to outdoor unit and commissioning of the system. Being a qualified electrician, ill be responsible for all electrical work required.
Specific Job Details:
Schedule: Not Specified
Budget: Not Specified
Site Visit: