Metal roof to ground floor extension of house, gutters, down pipes.
The new roof will attach to the side of the existing first floor extension.
Some 54 m2 of space to cover over a new truss frame.
Would like 0.48 Colorbond, insulating/reflective blanket under, all capping etc.
There will be 2x narrow 550mm Velux skylights on the Eastern side (I will supply the skylights).
Specific Job Details:
Schedule: Need job done on 21/11/2019 (well, second half of November)
Budget: Not Specified
Site Visit: Anytime