Run conduit and aerial for electrical work under steel roof cap. Have conduit power cable and aerial cable from sparky. Need cable run from main roof out to extension to power and aerial 5m extral aerial 15m. Should only take an hour or 2 all parts supplied.
Thanks
Dale
Specific Job Details:
Schedule: Not Specified
Budget: Not Specified
Site Visit: