A section of our guttering has rusted about 4 meters.(Old part that was never replaced) We would like this section to be replaced. Depending on price we might get an extra 1.5m replaced to take it all the way to the down pipe. The last 1.5m is newer, but we are not sure how well it joins at the downpipe. I would like you to have a look at the job before going ahead to avoid any misunderstanding.
Specific Job Details:
Schedule: Need job done this week
Budget: Not Specified
Site Visit: