Draft a fire plan (floor plan) for a single-level old church. No existing plan is available, so the drafter will need to measure the building from scratch on site. Wanted within 2 weeks. Number of spaces (about 3) to be confirmed on site.
Specific Job Details:
Schedule: Need job done in the next few weeks
Budget: Not Specified
Site Visit: Anytime